Water Dam | Active |
Structure | Dam |
Finality | Water treatment |
Type of structure | Dam |
Start of operation | 2021 |
Type of elevation | In steps |
Number of elevations carried out | NA |
Status | Active |
Constructive Method | Single step |
Pile of tailings | Active |
Structure | Pile of tailings |
Finality | Mining tailings |
Type of structure | Dry stacking |
Start of operation | 2021 |
Type of elevation | Continuous |
Number of elevations carried out | NA |
Status | Active |
Constructive Method | Stacking |
Pedra Dam | Active |
Structure | Pedra Dam |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2008 |
Type of elevation | In stage |
Number of elevations carried out | 1 |
Status | Active |
Constructive Method | Center line |
Peixes Dam | Inactive |
Structure | Peixes Dam |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 1998 |
Type of elevation | Continuous |
Number of elevations carried out | 8 |
Status | Inactive |
Constructive Method | Center line |
Security Dike | Inactive |
Structure | Security Dike |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 1983 |
Type of elevation | In stage |
Number of elevations carried out | 1 |
Status | Inactive |
Constructive Method | Center line |
Corrego da Lavagem Dam | Inactive |
Structure | Corrego da Lavagem Dam |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2002 |
Type of elevation | In stage |
Number of elevations carried out | 1 |
Status | Inactive |
Constructive Method | Center line |
Murici Deposit - Central Module | Active |
Structure | Murici Deposit - Central Module |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2011 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Single step |
Murici Deposit – East Module | Inactive |
Structure | Murici Deposit – East Module |
Finality | Industrial waste |
Type of structure | Dry stacking |
Start of operation | 2011 |
Type of elevation | Continuous |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Stacking |
Murici Deposit – West 1 Module | Active |
Structure | Murici Deposit – West 1 Module |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2016 |
Type of elevation | In stage |
Number of elevations carried out | 2 |
Status | Active |
Constructive Method | Downstream raising |
Murici Deposit – West 2 Module | Active |
Structure | Murici Deposit – West 2 Module |
Finality | Industrial waste |
Type of structure | Dry stacking |
Start of operation | 2018 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Stacking |
Garrote Stack | Active |
Structure | Garrote Stack |
Finality | Mining tailings |
Type of structure | Dry stacking |
Start of operation | 2019 |
Type of elevation | Continuous |
Number of elevations carried out | NA |
Status | Active |
Constructive Method | Stacking |
Aroeira Dam | Active |
Structure | Aroeira Dam |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2001 |
Type of elevation | In stage |
Number of elevations carried out | 7 |
Status | Active |
Constructive Method | Downstream raising |
Module III | Active |
Structure | Module III |
Finality | Sediments |
Type of structure | Dam |
Start of operation | 1984 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Single step |
Module IV | Active |
Structure | Sediments |
Finality | Sediments |
Type of structure | Dam |
Start of operation | 2022 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Single step |
Vaso Atacocha | Active |
Structure | Vaso Atacocha |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2008 |
Type of elevation | In stage |
Number of elevations carried out | 6 |
Status | Active |
Constructive Method | Downstream |
Ticlacayan | Inactive |
Structure | Ticlacayan |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2001 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single step |
Chicrin | Inactive |
Structure | Chicrin |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2001 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Upstream |
Malauchaca | Inactive |
Structure | Malauchaca |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2006 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Upstream |
Cajamarquilla | Inactive |
Structure | Cajamarquilla |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2005 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Poza 1 | Inactive |
Structure | Poza 1 |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | In stage |
Number of elevations carried out | 3 |
Status | Inactive |
Constructive Method | Jusante |
Poza 2 | Inactive |
Structure | Poza 2 |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 1988 |
Type of elevation | In stage |
Number of elevations carried out | 2 |
Status | Inactive |
Constructive Method | Single Step |
Poza 3 | Inactive |
Structure | Poza 3 |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 1993 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Poza 4 | Inactive |
Structure | Poza 4 |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 1996 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Poza 5 | Active |
Structure | Poza 5 |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2011 |
Type of elevation | In stage |
Number of elevations carried out | 2 |
Status | Active |
Constructive Method | Downstream raising |
Poza 6 | Active |
Structure | Poza 6 |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2014 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Single Step |
Poza Lodos Neutros | Active |
Structure | Poza Lodos Neutros |
Finality | Industrial waste |
Type of structure | Dam |
Start of operation | 2009 |
Type of elevation | In stage |
Number of elevations carried out | 4 |
Status | Active |
Constructive Method | Jusante |
Presa Pahuaypite I | Active |
Structure | Presa Pahuaypite I |
Finality | Sediments |
Type of structure | Dam |
Start of operation | 2007 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Single Step |
Presa Pahuaypite II | Active |
Structure | Presa Pahuaypite II |
Finality | Sediments |
Type of structure | Dam |
Start of operation | 2012 |
Type of elevation | In stage |
Number of elevations carried out | 0 |
Status | Active |
Constructive Method | Single Step |
Pahuaypite I | Active |
Structure | Pahuaypite I |
Finality | Mining tailings |
Type of structure | Dry stacking |
Start of operation | 2007 |
Type of elevation | Continuous |
Number of elevations carried out | NA |
Status | Active |
Constructive Method | Stacking |
Pahuaypite II | Active |
Structure | Pahuaypite II |
Finality | Mining tailings |
Type of structure | Dry stacking |
Start of operation | 2012 |
Type of elevation | Continuous |
Number of elevations carried out | NA |
Status | Active |
Constructive Method | Stacking |
Deposito de Relaves Campanayoc | Inactive |
Structure | Campanayoc Tailings deposit |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | Continuous |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Relavera Antigua 2 | Inactive |
Structure | Relavera Antigua 2 |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | Continuous |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Relavera Antigua 3 | Inactive |
Structure | Relavera Antigua 3 |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | Continuous |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Relavera Antigua 4 | Inactive |
Structure | Relavera Antigua 4 |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | Continuous |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
Relavera Antigua 5 | Inactive |
Structure | Relavera Antigua 5 |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | Continuous |
Number of elevations carried out | 0 |
Status | Inactive |
Constructive Method | Single Step |
El Porvenir | Active |
Structure | El Porvenir |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 1980 |
Type of elevation | In stage |
Number of elevations carried out | 13 |
Status | Active |
Constructive Method | Center line |
Sinaycocha I | Inactive |
Structure | Sinaycocha I |
Finality | Mining tailings |
Type of structure | Dam |
Start of operation | 2004 |
Type of elevation | In stage |
Number of elevations carried out | 2 |
Status | Inactive |
Constructive Method | Downstream |
Industrial Waste Pile | Inactive |
Structure | Industrial Waste Pile |
Finality | Disposal of Waste from the Hydrometallurgical Process |
Type of structure | Dry stacking |
Start of operation | 2027 |
Type of elevation | Continuous |
Status | In licensing |
Constructive Method | Stacking |